THE FOLLOWING DOCUMENTS MUST
BE SUBMITTED, UNLESS OTHERWISE NOTED:
- A Site Plan of the property, which includes the following information:
- Zoning set back lines
- Length and bearing of each property line
- Total tract area
- Right-of-way, floodplain, and/or easement lines and dimensions
- Physical features within the property such as catch basins, utility
structures, streams, accessory buildings, parking areas and driveways
- Contour lines for steeply sloped lots or spot elevations for level
lots
- Location of existing and alternate on-site sanitary sewerage facilities
and wells. This information should be obtained from the approved Sewerage
Permit.
- Location, outline and size of all existing structures and the proposed
structure(s) for which the Building Permit is requested.
- Three (3) sets of construction documents prepared by a registered
architect or professional engineer, which includes the following information:
- Depth of footing/foundation system, final grades in relation to
foundation wall system, floor to ceiling heights and overall height
of the proposed structure(s)
- Materials and dimensions of footings, foundation walls, sill plates,
anchorage, framing, furring, sheathing, insulation, parging, dampproofing
or waterproofing, and roofing systems
- Structural elements, including the size, material, direction and
location of all beams, girders, columns, lintels, joists, rafters,
studding, furring, and any required finishes and bracing
- Location of HVAC equipment, fireplaces and mechanical ventilation
equipment
- Special structures and unusual conditions may require additional information.
The applicant should consult with the Code Official for a list of information
that may be required.
- Applicable Permit fees are to be included with the submission of the
Permit Application.
- All contractors are required to be registered with the Township.
- Applications properly completed and received will be reviewed in the
order that they are received. If approved, a set of the construction
documents will be returned with the Permit noting changes or modifications
required by the Township Code and the Inspection requirements.
INSPECTIONS
Although the Building Inspector may make unannounced, periodic inspections,
the following inspections are required and are the applicant’s responsibility
to verify that the required inspections have been conducted and approved:
ü FOOTING
After preparation and prior to the placement of concrete
ü FOUNDATION
Prior to backfilling, after waterproofing and/or dampproofing
is applied and after first floor deck framing is completed
ü FRAMING
Before insulation is installed and after the rough plumbing,
mechanical and electrical work has been inspected and approved
ü FINAL
After construction is completed and prior to use, after
the final plumbing, mechanical and electrical work has been inspected
and approved
BY CALLING TO SCHEDULE AN APPOINTMENT FOR THE REQUIRED INSPECTIONS YOU
WILL HELP KEEP YOUR CONSTRUCTION WORK ON SCHEDULE. A MINIMUM OF 24-HOUR
NOTICE IS REQUIRED FOR ALL INSPECTION, A MINIMUM OF 72 HOUR NOTICE IS
REQUIRED FOR ALL FINAL INSPECTIONS.
Click Here for Building Permit PDF
|